The Environmental Management Consultancy

Tel: +44 (0)7940 398663 

 

 

 

 

 

 

 

 

 

Environmental & Management Experience

 

Earth Consulting and Management Services Ltd works for an extensive and diverse client base, both nationally and internationally. These includes but not limited to:

Private and Public Sectors; Local, States and Federal Authorities; Landowners; Consulting Engineers; Developers; Engineering Contractors; House Buyers; Lawyers; Planning Consultants; Industrial Operators; Regulators and Government Agencies.

Here are few of the projects both the Principal and Associate Consultants have been involved over the years.

 

ENVIRONMENTAL MANAGEMENT

            Principal Consultant.

  • Use of Eco –Bio micro nutrients to enhance Biological Treatment of Landfill Leachate in a Sequential Batch Reactor for Shanks Waste Solutions, Bedford, UK (2003)

  • Compliance audits of petrol filling stations, vehicle refinishers, mobile crushing, crematoria, metal and plastic coating, dry cleaner, unloading of petrol, gas odourization and hot dip galvanizing authorised under the Local Authority Pollution Prevention Control – Environmental Permitting Regulation (2008)

  • Updating and Screening Assessment 2009 Air Quality Report for Peterborough City Council, UK (2009)

  • Review and Assessment of the Environmental Impact Assessment & Planning Application for Energy from Waste facility at Peterborough City Council, UK (2009)

  • Review and Assessment of Environmental Impact Assessment & Planning Application for Integrated Material Recycling facility at Peterborough City Council, UK (2009)

  • Air Quality monitoring using diffusion tubes for environmental levels of Nitrogen Dioxide and Benzene in the air at Peterborough, UK (2009)

  • Review of Contaminated Land Report for determining Stanground Landfill site, Peterborough, UK (2009)

  • Review and Assessment of Environmental Impact Assessment (Scoping & Screening) report for Sugar House Lane, Stratford, UK (2011)

  • Review and Assessment of the remediation strategy for the National Grid gas holding plant, UK (2011)

  • Updating and Screening Assessment 2012 Air Quality Report for  London Borough of Havering, UK (2012)

  • Air Quality Monitoring and Assessment of Thanet District Council, UK (2012)

  • Re - Identification & Prioritisation of Potential Contaminated Land sites,  UK - Ongoing

  • Review and Assessment of Planning Applications Air Quality and Contaminated land Reports for Worcestershire Regulatory Services, UK (2013)

     

            Associate Consultant.

  • Environmental Impact Assessment of the Proposed UNICEM Cement Factory Extension, Calabar, Cross River State, Nigeria, 2012 – in progress (Consultant)

  • Environmental Impact Assessment of the Proposed 30 MW Independent Power Plant at Omotosho Industrial Park, Ore, Ondo State, Nigeria, 2013 – in progress (Coordinator)

  • The Assessment of Emissions from Road Transport (Oshodi – Obalende via Mile 2 and CMS BRT Corridor) 2009 – 2010 (Consultant)

  • Environmental Impact Assessment of the proposed Efire-Olokola Roads and Bridges, Ogun State Govt., 2007-2008 (Project Coordinator)

  • Environmental Impact Assessment of the Boubouwei-bou Gas Exploration Well, SPDC,2007.(Biophysical Consultant)

  • Environmental Impact Assessment of the Elepa Gas Appraisal Well, SPDC, Port Harcourt, 2007(Biophysical Consultant)

  • Environmental Audit of Yale Biscuit Factory operations, Ibadan, 2006-2007 (Principal Consultant)

  • Environmental Audit of Mobil Oil Processing plant operations, Apapa, 2006-2007 (Principal Consultant)

  • Environmental Impact Assessment of the Aba – Owerri – Onitsha PHCN Transmission line, 2006 (Project Coordinator)

  • Environmental Impact Assessment of the Alaoji Power Station, 2006 – 2007(Project Coordinator)

  • Baseline Studies for the EIA of the OLOKOLA LNG Development Project, 2005-2006 ( Project Coordinator)

  • Midterm Review of the World Bank - assisted NEPA NTDP project 2006, ( Environmental Consultant)

  • Environmental Impact Assessment of the Construction of the Lagos 2nd outer ring Road, 2005 (Principal Consultant).

  • Environmental Assessment of the Factory Premises of Osogbo Steel Rolling Company Ltd., Osogbo, 2004, (Principal Consultant).

  • Environmental Assessment of the Factory Premises of Katsina Steel Rolling Mills Ltd., Katsina, 2004, (Principal Consultant)

  • Environmental Assessment of the Factory Premises of Jos Steel Rolling Mills Ltd., Jos, 2004, (Principal Consultant).

  • Environmental Assessment of the Factory Premises of the Federal Superphosphate Fertiliser Company Ltd., Kaduna, 2002 (Principal Consultant).

  • Environmental Assessment of the Factory Premises of the Electricity Meter Corporation of Nigeria (EMCON), Zaria, 2002, (Principal Consultant)

  • Environmental Assessment of the factory premises of the Nigeria Mining Corporation Subsidiaries, 2002 (Principal Consultant).

  • Environmental Evaluation Report (EER) of the WAPCO factories at Ewekoro and Sagamu, 1997-1998.(Project Coordinator).

  • Environmental Impact Assessment of the new Clinker Line of WAPCO factory at Ewekoro, 1998-1999.(Project Coordinator)

  • Air Quality Study of CISCO Factory Premises and Surrounding Environment, 1994-95 (Project Coordinator).

  • Detailed Survey of Potentially Polluted Areas of SPDC-W (Block V), 1995-96 (Project Coordinator)

  • Review of Previous Environmental Studies by WAPCO Plc, Ikeja 1997 (Project Coordinator)

  • Effluent and Groundwater Monitoring in the Western Areas of operation of Shell Petroleum Development Company, Nigeria 1994-1995 (Project Coordinator)

  • Acid Rain Studies in the Western Areas of Operation of Shell Petroleum Development Company, Nigeria 1994-1996 (Project Coordinator).

  • Environmental Audit of Pfizer factory Premises, Oregun , Lagos State, Nigeria 1994.

  • Cost-effective Corrosion Management Procedures for NNPC Gas Pipelines. 1993-1994 (Project Coordinator).

  • Environmental Audit of ABM factories at Oregun & Ikeja, 1993 (Project Coordinator ).

  • Environmental Impact Assessment (EIA) study of the establishment of Explosives Factory at Abeokuta, 1993-94 (Project Coordinator).

  • Environmental Impact Assessment of NNPC Phase III Oil Pipeline, Auchi Kaduna-Jos-Gombe, 1992-93 (Consultant) .

  • Post-Impact Assessment of Utorogu Shell Oil Field, 1992-93 (Consultant).

  • Environmental Monitoring and Impact Assessment of the areas of Operation of Benue Cem. Co., 1992(Consultant).

  • Physico-Chemical and Microbiological Analysis of Factory Wastewater at Kay Industries, Ikeja , 1992 ((Project Coordinator).

  • Environmental Monitoring of the Areas of Operation of the Nigeria Wire Industries (NIWIL), Ikeja (1992) (Project Coordinator).

  • Study of the effects of Abesan, Sewage Treatment Plant Discharges of the Abesan River, Lagos State, Aug-Dec. 1991 (Project Coordinator).

  • Environmental Monitoring and Impact Assessment at Ashaka Cement Works and Environs, (1992) (Consultant).

  • Environmental Monitoring and Impact Assessment in the areas of Operation of Operation of the West African Portland Cement Company-Phases I &II 1989-91, (Project Coordinator).

 

 

 